top of page

Job Management

Production (Lm3) = CxSxVxBxE

 

Where:

 

C=Cycles/hr (Cycles Table)

 

S=Swing depth factor (Depth Factor Table)

 

V=Heaped bucket volume (Lm3)

 

B=Bucket fill factor (Fill Factor Table)

 

E=Job efficiency 

Conditions to select a backhoe:


- Maximum depth of excavation - working radius
- Dumping height required

 

During working check:


- Clearance for the carrier

- Superstructure
- Boom during operation 

Productivity Estimation

© 2015 by Leonardo A. Armijos Leray. Created with Wix.com

bottom of page